PQ for colloid mill

i’m doing a performance qualification of vibrating garnulator and colloid mill. im very confused with the method for performance qualification. can somebody help me with the method?
thank you

Base on your MI; load the materials sifted or milled the materials.
Checked for the retain materials; that will be your acceptable standard.
To carried out this experimental plan for three batches.

Hope it help.

elamudi

Checked for the retain materials; that will be your acceptable standard.” did you mean visual check?but i dont have the material retain becoz all the material already used. so i dont have the standard.
thank you

Thanks for the info; you would not believe how dificult it is to get the leads when you don’t know. I’ve to do a paper for this for a local journal.