My query is regarding tunnel sterilzation

My conveyor lenght is 929.and speed is about 110so should run for an 8 min.my qeustn is is it required to run hold 8 min for more than 300 arelse is it k with 150 sec

Plz ignore the above mail it is the lenght of hot zone.(920)